INSPECTION RESULTS       BACK TO DEMO INFORMATION PORTAL

CUSTOMER INFORMATION PORTAL - DEMO

DATE PART AREA LOT QTY SAMPLE QTY REJ QTY YIELD
4/6/2004 DEMO12345 (400) FINAL INSPECTION 3 3 0 100
4/6/2004 DEMO5643 (130) SECOND ASSEMBLY 90 30 1 97
4/6/2004 DEMO5643 (130) SECOND ASSEMBLY 276 175 13 93
4/6/2004 DEMO5643 (400) FINAL INSPECTION 67 67 4 94
4/6/2004 DEMO5643 (900) REWORK INSPECTION 10 10 0 100
4/6/2004 DEMO5643 (400) FINAL INSPECTION 10 10 1 90
4/6/2004 DEMO5643 (400) FINAL INSPECTION 6 6 0 100
4/6/2004 DEMO5643 (400) FINAL INSPECTION 1 1 0 100
4/6/2004 DEMO99999 (130) SECOND ASSEMBLY 50 50 3 94
4/6/2004 DEMO99999 (130) SECOND ASSEMBLY 132 124 10 92
4/6/2004 DEMO99999 (900) REWORK INSPECTION 2 2 0 100
4/6/2004 DEMO99999 (116T) SMT LINE 3 TOPSIDE 802 802 1 100
4/6/2004 DEMO99999 (121) PACELINE 3 1 1 0 100
4/6/2004 DEMO8765 (126) WAVE / POST-WASH (OMEGA) LINE 3 1 1 0 100
4/6/2004 DEMO8765 (130) SECOND ASSEMBLY 2 2 0 100
4/6/2004 DEMO8765 (900) REWORK INSPECTION 7 7 0 100
4/6/2004 DEMO8765 (130) SECOND ASSEMBLY 46 46 1 98